HAMPTON INN AND SUITES
PANAMA CITY BEACH, FL
2016
General Contranctor:
Robins and Morton
Scope of Work:
Structrual Steel, Pedestrian Bridge, Miscellaneous Metals.
In 2016 Daniel Iron helped Robins and Morton with a project right on Panama City Beach. The Hampton Inn and Suites had a few structrual components, but the bulk of the work was a 250 foot pedestrian bridge that connects the parking deck the hotel. The monster bridge trusses were built up into 5 shop assembled sections, while Daniel's erector field assembled three on teh ground and lifted into place over Front Beach Road in a single night. As you can see from the pictures, everything turned out great.