GWU SCIENCE AND ENGINEERING HALL

WASHINGTON, DC
2013

General Contranctor:
Clark Construction
Scope of Work:
Monumental Stair, Ornamental Metals.

Daniel Iron is currently working on a large scale project with Clark Construction in downton DC at George Washington University called the Science and Engineering Hall. Daniel is contracted to perform the ornamental metals scope of work including a very large monumental stair. At the end of 2013, Daniel used the job's tower crane to fly the stringers through the roof of the building. Daniel erected all 9 stingers in a matter of 2 days. The job is ongoing and is scheduled to be complete in 2015.