WESTERN FIT OUT

MOUNTAIN BROOK
2016

General Contranctor:
Hoar Construction
Scope of Work:
Steel mezzanines, stairs, rails, miscellaneous metals.

Daniel Iron completed the Western Tennant Fit Out job for Hoar Construction late in 2016. The job was very challenging in that it had a large steel framed mezzanine inside the existing building with a radius stair and guard rail on it. As you can see from the pictures, everything turned out great.

<<  11 12 13 14 15 [16